header

Author: Re Sustainability

Integrated Sustainability Services: Tata SEZ and Industrial Parks in Telangana

Integrated Sustainability Services: Tata SEZ and Industrial Parks in Telangana

Environmental Compliance, Planning, and ZLD CETP Implementation with Long-Term O&M Solutions Tata Sez, Kakatiya Mega Textile Park and Pashamylaram Industrial Park in Telangana • Rapid Environmental Impact Studies (EIS) and predictive modeling to evaluate and quantify potential environmental impacts • Comprehensive pre-feasibility report and EIA • Environmental Management Plan (EMP).
Circularity Solutions: Plastics Sector

Circularity Solutions: Plastics Sector

Transforming Plastic Waste Biomedical Waste Bags from Recycled LDPE • Advanced technology to process LDPE material and Ocean Bound Plastic. • Reduced landfill-bound plastic, carbon footprint, and reliance on new plastics. • Certifications for ISO 9001:2015, 14001:2015, 45001:2018, Global Recycled Standard (GRS), and Ocean Bound Plastic Standard. ReSL’s plastic recycling.
Circularity Solutions: Construction Sector

Circularity Solutions: Construction Sector

Circular Solutions for the Construction Industry Transforming Noida Twin Tower Demolition Waste into Paver Blocks • Customized and responsive solution for collection and processing of 6,000 tons demolition debris. • Waste transformed into 30,000 reusable paver blocks. In a significant step towards sustainable waste management, ReSL collected 6,000 tonnes of.
Development Of Environmental Standards: Central Pollution Control Board

Development Of Environmental Standards: Central Pollution Control Board

Central Pollution Control Board Comprehensive Industry Documents on Best Available Technologies and Emission Standards for the Pharmaceutical and Textile Industries. • Inventorization of bulk drug and textiles manufacturing facilities in India. • Assessment of environmental impacts of the industries. • Identification of cost-effective textiles manufacturing process technologies. • Identification of.
Site Remediation: Chromium Impacted Area In India

Site Remediation: Chromium Impacted Area In India

Site Remediation Management of Hexavalent Chromium Waste under MoEF&CC and CPCB Led Project • Remediated 16.5 acres of contaminated land in Rania, Kanpur. • Safely disposed of 55,628 metric tonnes of hazardous hexavalent chromium waste. • Key activities included drone surveys, excavation, transportation, stabilization units to neutralize chromium waste, testing,.